Status Operational Height 123 m Construction began 2002 | Purpose Power Type of dam Embankment, rock-fill Opened 2007 | |
![]() | ||
Opening date 2007; 10 years ago (2007) |
The Qiaoqi Dam is a rock-fill embankment dam on the Baoxinghe River in Baoxing County of Sichuan Province, China. The primary purpose of the dam is hydroelectric power generation. Construction on the project began in October 2002 and its 240 MW power station was commissioned in 2007. Water from the reservoir is diverted south to the power station via a 18.676 km (11.605 mi) long head-race tunnel and penstock. The power station is located on the north bank of the main stem Baoxing River. The drop in elevation between the reservoir and power station afford a hydraulic head of about 550 m (1,800 ft).
References
Qiaoqi Dam Wikipedia(Text) CC BY-SA