Supriya Ghosh (Editor)

Qiaoqi Dam

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
China

Status
  
Operational

Height
  
123 m

Construction began
  
2002

Purpose
  
Power

Type of dam
  
Embankment, rock-fill

Opened
  
2007

Qiaoqi Dam

Location
  
Baoxing County, Ya'an, Sichuan

Opening date
  
2007; 10 years ago (2007)

The Qiaoqi Dam is a rock-fill embankment dam on the Baoxinghe River in Baoxing County of Sichuan Province, China. The primary purpose of the dam is hydroelectric power generation. Construction on the project began in October 2002 and its 240 MW power station was commissioned in 2007. Water from the reservoir is diverted south to the power station via a 18.676 km (11.605 mi) long head-race tunnel and penstock. The power station is located on the north bank of the main stem Baoxing River. The drop in elevation between the reservoir and power station afford a hydraulic head of about 550 m (1,800 ft).

References

Qiaoqi Dam Wikipedia