Country
  
Philippines

Status
  
Operational

Type
  
Onshore

Location
  
Pililla, Rizal

Commission date
  
2016

Construction began
  
18 June 2013

Pililla Wind Farm httpsmediacdntripadvisorcommediaphotos09

Operator(s)
  
Alternergy Philippine Holdings Corporation (APHC)

Similar
  
Calinawan Cave, Daranak Falls, Regina Rosarii Institute f, Batlag Falls, Mount Sembrano

The "Pililla, Rizal" Wind Energy Service Contract granted to Alternergy Philippine Holdings Corporation (APHC) covers an area of 4,515 hectares under Department of Energy WESC NO. 2009-09-018. This Wind Energy Service Contract (WESC) has two phases, Pililla Wind Power Project under WESC NO. 2009-09-018-AF1 and the Mt. Sembrano Wind Power Project under WESC NO. 2009-09-018-AP2.

Pililla Wind Farm Pililla Wind Farm in Rizal Windmills Near Manila The Poor Traveler

In December 2008, Alternergy Philippine Holdings Corporation (APHC) was awarded by the Department of Energy (DOE) the exclusive right to develop wind power projects in 3 locations: Pililla in Rizal, Abra de Ilog in Occidental Mindoro, and Kalayaan, Laguna. These locations were among those identified under the Philippine Wind Atlas as potential sites for wind farms due to good to excellent wind resources. APHC was subsequently awarded additional wind energy service contracts in 3 other locations in 2009. APHC is committed to implement the wind projects if the wind measurements and site specific studies demonstrate that the power plants are commercially viable.

Pililla Wind Farm PILILLA WIND FARM How to Get There What to Expect

Phase 1 of this project is a wind farm in Barangay Halayhayin in Pililla, Rizal, Philippines. The wind farm is being undertaken by Alternergy Wind One Corporation. The total cost for the construction of the wind farm is US$177.9 million.

Pililla Wind Farm Lantaw Philippines Outdoor and Travel Photos rizal pililla wind

The project consists of 27 wind turbine generators grouped into three clusters with aggregate capacity of 54 megawatts (MW). The said project, after completion will interconnect to Meralco’s Malaya-Teresa 115 kilovolts (kV) transmission line located just 10 kilometers from the project site.

Pililla Wind Farm Alternergy Pililla Wind Farm 54MW PILILLA RIZAL WIND FARM Flickr

Phase 2 located in Pililla, Rizal and Mabitac, Laguna was not initially included by Alternergy Philippine Holdings Corporation (APHC) in the Technical Assistance (TA) from the Asian Development Bank. A minor change in the ADB TA implementation was approved in February 2013 to prioritize the development of the Pililla, Rizal wind farm site and expand the study to Pililla Stage 2, which covers the southern portion of the area, as initial findings showed certain limitations in wind resource and constructability in the Laguna and Occidental Mindoro sites. Construction of a wind power project in Abra de Ilog, Occidental Mindoro, in particular, is not feasible until either the National Grid Corporation of the Philippines or the Philippine government has installed a submarine cable connecting Mindoro and Luzon. Based on the initial findings, further studies on the Laguna and Mindoro sites were discontinued; unutilized TA budget for these sites were reallocated instead to fund the study for Pililla Stage 2. The projected cost for Phase 2 is Php 7.056 Billion and its planned output is 72 megawatts (MW).

Pililla Wind Farm Pililla Wind Farm in Rizal Windmills Near Manila The Poor Traveler
Pililla Wind Farm PILILLA WIND FARM How to Get There What to Expect

Pililla Wind Farm

References

Pililla Wind Farm Wikipedia