Philippsburg Nuclear Power Plant

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Germany

Cooling source
  
Rhine River

Units operational
  
1 PWR × 1392 MW net

Operator
  
Commission date
  
May 7, 1979

Cooling towers
  
2

Capacity factor
  
89.3%

Construction began
  
1970

Philippsburg Nuclear Power Plant httpsuploadwikimediaorgwikipediacommonsthu

Similar
  
Greifswald Nuclear Power Pl, AVR reactor, SNR‑300, Stendal Nuclear Power Pl, Deep geological repository

The Philippsburg Nuclear Power Plant is located in Philippsburg in Karlsruhe (district). It is operated by EnBW Kernkraft GmbH.

It houses two units, the first a boiling water reactor (BWR) and the second a pressurized water reactor (PWR).

For the first unit, parts made for the cancelled Wyhl plant were used. The second unit was originally planned to be a BWR as well but plans later changed. Final disconnection for both units was scheduled for 2011 for unit 1 and 2017 for unit 2, but as of 2010 had been changed to 2026 and 2032 respectively.

Following the incident at the Fukushima plant in Japan reactor 1 was closed on 17 March 2011 for a three-month moratorium on nuclear power. The outcome of this moratorium was announced on the morning of 30 May 2011 and Philippsburg-1 was named as a plant that would not be returning to generation at the end of the moratorium.