Country Lithuania Status Operational Construction cost 130+ mil. LTL Operator Panevėžio energija | Location Panevėžys Commission date 2008 Construction began 2006 | |
![]() | ||
Official name Panevėžio termofikacinė elektrinė |
Panevėžys Combined Heat and Power Plant is a natural gas-fired power plant in Panevėžys, Lithuania.
References
Panevėžys Combined Heat and Power Plant Wikipedia(Text) CC BY-SA