Neha Patil (Editor)

Paimpol–Bréhat tidal farm

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
France

Commission date
  
2012 (expected)

Nameplate capacity
  
2 MW 8 MW (Planned)

Construction cost
  
55 million USD

Status
  
Under construction

Type
  
Tidal stream generator

Make and model
  
DCNS

Units operational
  
4

Location
  
Off Île-de-Bréhat, near Paimpol

The Paimpol–Bréhat tidal farm is an 8 MW tidal turbine demonstration farm off Île-de-Bréhat near Paimpol, France. It is developed by Électricité de France (EdF). The project was initiated in 2004 and work began in 2008.

The tidal farm will consist of four turbines, 2 MW each. Turbines are assembled by DCNS and installed by OpenHydro. The first turbine was installed in August 2011. According to EdF, when completed it will be the world's largest tidal array and the world's first grid-connected tidal energy farm.

References

Paimpol–Bréhat tidal farm Wikipedia