Owner
  
Town of Sospel

Condition
  
Preserved

Controlled by
  
France

Open to the public
  
Yes

Built by
  
CORF

Ouvrage L'Agaisen

Materials
  
Concrete, steel, rock excavation

Battles/wars
  
Italian invasion of France, Operation Dragoon

Similar
  
Ouvrage Barbonnet, Ouvrage Monte Grosso, Ouvrage Saint‑Roch, Ouvrage Castillon, Ouvrage Fressinéa

Ouvrage L'Agaisen is a work (gros ouvrage) of the Maginot Line's Alpine extension, the Alpine Line, also known as the Little Maginot Line. The ouvrage consists of one entry block, two artillery blocks and one observation block above Sospel. Additional blocks were planned but not built. The ouvrage is located at an altitude of 663 metres (2,175 ft) on the Agaisen massif overlooking Sospel from the north. The position fired 1821 shots from Block 3's 75mm gun turret in 1940. It has an unusual 75mm gun turret in Block 3.

Contents

The ouvrage was built between 1930 and 1935, and was equipped from 1935 to 1937. L'Agaisen possesses an instruction casemate that was used to allow soldiers to practice attack and defense skills.

Description

Ouvrage l'Agaisen was built between November 1930 and December 1934, beginning with a contractor named Marting and completed by Roussel. The construction cost was 24.6 million francs, of which 2.7 million francs were for the access road. The underground galleries run parallel with the ridge, the barracks under the summit. Block 4, an observation block, is at the extreme east end of the ridge.

  • Block 1 (entry): one machine gun cloche, one grenade launcher cloche and two machine gun embrasures.
  • Block 2 (artillery): one machine gun cloche, one grenade launcher cloche, one twin machine gun cloche, one twin machine gun embrasure, two 75mm/31cal gun embrasures and two 81mm mortar embrasures, firing to the southwest.
  • Block 3 (artillery): one machine gun cloche, one twin machine gun cloche, one twin 76mm/31cal retractable gun turret and one twin machine gun embrasure. The turret has a 360-degree field of fire from the summit.
  • Block 4 (observation): one observation cloche, two machine gun embrasures.
  • A fifth block with four 81mm mortars was never built.Three observation posts ere associated with l'Agaisen, including the petit ouvrage Champ de Tir de l'Agaisen.

    History

    During the Italian invasion of France in June 1940 the 75mm turret fired more than 1800 shots in support of French forces. The heavy machine gun cloche in Block 2 fired on Italian forces in the area of the advanced post at Castes-Ruines. The ouvrage took fire from Italian 305mm artillery without significant damage. A crater caused by an Italian bomb existed until the 1990s.

    Some of the fort's armament was removed under the terms of the 25 June 1940 armistice, but the ouvrage was maintained by French forces through the war, albeit in a militarily decommissioned capacity. l"Agaisen was occupied by German forces after their withdrawal from the war in 1943, remaining until the allied invasion of Southern France in 1944. The Germans fired on advancing American forces with the 75mm turret in October, abandoning the position on October 28, 1944 after sabotaging some of the equipment. The American 442nd Infantry Regiment, composed of mostly Japanese-American soldiers, occupied the site in November 1944. During fighting around Authion in April 1945 the 75mm turrets of l'Agaisen and Monte Grosso were used in support of American and French forces in the area. An abundance of French 75mm ammunition, incompatible with American 76mm guns, encouraged the reconditioning and used of the turret guns.

    After the war l'Agaisen was reconditioned using equipment from Barbonnet and Castillon. Equipment was upgraded through the 1950s and new mortars were delivered in 1962. Through the 1980s the position was kept under care of the Army with a view to preservation. In 1992 the Groupe Technique Agaisen (GTA) was formed to collaborate on preservation and restoration. L'Agaisen was transferred to the ownership of the town of Sospel in 2007.

    L'Agaisen may be visited during open days or by prior arrangement.