Status
  
Under construction

Location
  
Bucharest

Floor area
  
4 ha

Owner
  
CA Immo

Floor count
  
17

Type
  
Office building

Tip
  
85 m (279 ft)

Cost
  
75 million EUR

Estimated completion
  
2017

Groundbreaking
  
2015

Architect
  
BEHF Corporate Architects

Address
  
Șoseaua Orhideelor 15A, București, Romania

The Orhideea Towers, is a future class A office building complex that will be constructed in the western part of Bucharest in the vecinity of the Politehnica University of Bucharest. The complex comprises two office buildings, one 17 floors, 85 m (279 ft) tall and the other 13 floors, 64 m (210 ft) with a total gross leasable area of 37,000 m2 (400,000 sq ft). At completion the 85 m (279 ft) high building complex will be one of the tallest in Bucharest. The construction of the building started in October 2015 and is expected to be completed in the first quarter of 2017 at a total cost of €75 million.

The original project consisted of two 20 floor buildings covering 50,000 m2 (540,000 sq ft) but eventually was modified to comprise the current 17 and 13 floor buildings linked together by a skybridge. The complex is directly linked to the nearby Grozăvești metro station by an underground tunnel specially built for the project.