Former names
  
Highland House

Location
  
Salford

Floor count
  
23

Opened
  
1966

Floor area
  
1 ha

Type
  
Highrise

Completed
  
1966

Height
  
80 m

Floors
  
23

North Tower (Salford) httpsuploadwikimediaorgwikipediacommonsthu

Architect
  
Leach, Rhodes, & Walker

Similar
  
St Mary the Virgin's Church - E, Clifton Viaduct, Cadishead Viaduct, Victoria Theatre - Salford, Victoria Bridge - Manchester

North Tower (formerly Highland House) is a highrise building on Victoria Bridge Street in Salford, England. The building is 23 stories tall with a podium at the base, which gives it a total height of 80 metres (260 ft), making it one of the tallest buildings in Salford. The building lies just over the border with the City of Manchester, less than 100 metres (330 ft) from Manchester Cathedral, and is within Manchester City Centre as defined by Manchester City Council. The top twelve floors hold 96 apartments, with the lower ten used as a Premier Inn hotel.

Map of North Tower, Salford M3 5AS, UK

The building was designed and built by Leach, Rhodes & Walker (now Leach Rhodes Walker) for the Inland Revenue, and was completed in 1966. This was not LRW's only work for the Inland Revenue; they also constructed Aldine House in 1967, as well as Trinity Bridge House in 1998.

The tower was built using the (then) innovative technique of using a continuously climbing shutter to cast a central core; pre-fabricated cladding was then lifted into place using a tower crane. This technique led to rapid construction, avoided the need for scaffolding, and allowed the lower floors to be occupied while building continued higher up. The combination was very cost-effective, but was not flawless; on a windy night the windows of the building blew off, ending up in Salford Bus Station.

It changed hands in 1994 for £7.7 million. The Inland Revenue announced plans to move out in 1995 in an early example of a Private Finance Initiative, described as the most complex to date, and shortly afterwards the building was sold by London & Regional Properties to the Bruntwood group. Between 1998 and 2000 the building was reclad, converted to its current use and renamed, at a total cost of £4.5 million. In 2004 the president of the Royal Institute of British Architects, George Ferguson, said that the building (along with the Arndale Centre) was "dreadful" and should be demolished.

References

North Tower (Salford) Wikipedia