Type Rapid transit Locale Lucknow Opened 26 March 2017 | System Lucknow Metro Stations 22 | |
Termini Amausi Airport
Munshi Pulia |
The North-South Corridor of the Lucknow Metro is an under construction metro route of mass rapid transit system in Lucknow. It consists of 22 metro stations from CCS International Airport to Munshi Pulia with a total distance of 25.15 km. Most of the line is elevated.
The first section of the line, an 8.5 km stretch from Transport Nagar to Charbagh, is expected to open on 26 March 2017. The remaining section of the line is scheduled to opened in 2019.
List of stations
Following is a list of stations on this route
References
North-South Corridor Line (Lucknow Metro) Wikipedia(Text) CC BY-SA