Commission date 2020 Construction began 2014 | Status Proposed Units planned 4 x 1,000 MWe | |
![]() | ||
Location Vĩnh Hải, Ninh Hải District, Ninh Thuận Province |
The Ninh Thuận 2 Nuclear Power Plant is a planned nuclear power plant at Vĩnh Hải, Ninh Hải District, Ninh Thuận Province, Vietnam. It will consist of four 1,000 MWe reactors. The feasibility study to be carried out by Japan Atomic Power Company. Japan Atomic Power Company will also consult the project. The plant will be built by a consortium, International Nuclear Energy Development of Japan Co, which comprises 13 Japanese companies. The plant will be owned and operated by state-owned electricity company EVN.
Unit 1 is expected to be commissioned in 2021, unit 2 in 2022, unit 3 in 2024 and unit 4 in 2025.
A marine geological survey for preparations of construction was carried out by the Japan-based Kawasaki Geological Survey Company at the ship M.T. Chōyō.