Status
  
C

Impounds
  
Indus River

Spillway type
  
Blocks

Phone
  
01982 205 069

Construction began
  
September 2006

Spillways
  
5

Height
  
57 m

Owner
  
NHPC Limited

Nimoo Bazgo Hydroelectric Plant

Type of dam
  
Concrete-face rock-fill

Address
  
Ladakh, Alchi, Jammu and Kashmir 194107

Hours
  
Open today ยท Open 24 hoursTuesdayOpen 24 hoursWednesdayOpen 24 hoursThursdayOpen 24 hoursFridayOpen 24 hoursSaturdayOpen 24 hoursSundayOpen 24 hoursMondayOpen 24 hoursSuggest an edit

Similar
  
Uri Dam, Kishanganga Hydroelectric Plant, Dul Hasti Hydroelectric Plant, Baglihar Dam, Ratle Hydroelectric Plant

The Nimoo Bazgo Power Project is a run-of-the-river power project on the Indus River situated at Alchi village, 75 kilometres (47 mi) from Leh in the Indian state of Jammu and Kashmir. The project was conceived on July 1, 2001 and approved on June 8, 2005, and construction began on 23rd Sept, 2006. The project involves construction of a 57-high m (187 ft) concrete dam with five spillway blocks of 13 m (43 ft) each having ogee profile.

The Nimoo Bazgo power project envisages utilizing a rated net head of 34 m (112 ft) to generate 239.30 gigawatt-hours (861.5 terajoules) in a 90% dependable year. The project has three surface power units of 15 MW (20,000 hp) each with an total installed capacity of 15 megawatts (20,000 hp). Every unit has a 3.3 m (11 ft) diameter, each 63 m-long (207 ft) penstocks. Each operating unit will be designed for a discharge of 48.7 m3/s (1,720 cu ft/s) and also have transformer yard and switch yard. The project will be connected to the northern grid through a 220 kV transmission line from Leh to Srinagar (the line is scheduled for commissioning with project commissioning). The dam diverts water from the river by a 372 m (1,220 ft) long diversion channel and involves a flooding of only 3.42 km2 (1.32 sq mi). Thus the power density is 13.16 megawatts per square kilometre (13.16 W/m2; 34.1 MW/sq mi). The project is being developed by National Hydroelectric Power Corporation (NHPC) Ltd., while Bharat Heavy Electricals Ltd. (BHEL) has executed the Electro-Mechanical works.

All the three units of the project have been successfully commissioned. The project was inaugurated on August 12, 2014 by the Prime Minister of India Narendra Modi, in a ceremony attended by senior officials including Chief Minister of Jammu & Kashmir Omar Abdullah, National Security Adviser Ajit Kumar Doval and others.

References

Nimoo Bazgo Hydroelectric Plant Wikipedia