Official name NewLincs EfW facility Commission date 2004 | Primary fuel Waste | |
![]() | ||
Operator(s) NewLincs Developments Ltd |
The Newlincs EfW facility is an incinerator which is located in Grimsby, North East Lincolnshire, England. The plant is operated by Cyclerval UK & TIRU Group under a PFI contract. The engineering of the facility is unusual as it consists of an oscillating kiln handling 56,000 tonnes of waste per year/7 tonnes per hour of waste. The facility is capable of generating 3.2 MW electricity.
References
Newlincs EfW facility Wikipedia(Text) CC BY-SA