National Wind Tunnel Facility

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit

The National Wind Tunnel Facility (NWTF), is a new initiative in which 17 tunnels distributed across seven UK universities (host institutions) are made open access (for up to 25% of time) to external researchers in the UK and abroad, from both university and industry based. NWTF is intended to be as inclusive as possible while still supporting the best science. The scheme was announced on 9 January 2014 by David Willetts, Minister for Science and Universities. The total funding for the Facility is £13.3 million, £10.7 million coming from EPSRC and £2.6 million from the UK Aerospace Technology Institute. Recognising that the UK has a world-class talent base, a decision was taken by EPSRC and ATI to fund the NWTF and was taken to match this talent base to world-class facilities. The enhanced UK capability in experimental aerodynamics is available to all UK-based researchers and aims to create nodes of excellence attracting young researchers. The NWTF also aims to establish a closer tie with industry creating a pull-through environment and an intended spill-over of the collaboration and benefits to other sectors.

Governance

The NWTF has a Management Board (MB) that meets approximately every 3 months. This is composed of a Principal Investigator from each of the current host institutions and the NWTF Project Manager. The current MB members are Professor Holger Babinsky (University of Cambridge), Professor Chris Atkin (City University), Professor Kevin Garry (Cranfield University), Dr Richard Green (University of Glasgow), Professor Jonathan Morrison (Imperial College), Professor Peter Ireland (University of Oxford), Professor Bharathram Ganapathisubramani (University of Southampton) and Dr Kevin Gouder (NWTF Project Manager). An Advisory Board (AB) oversees the broader aims of the NWTF, monitors the running of the NWTF and reviews progress versus Key Performance Indicators. The AB is composed of representatives from EPSRC, ATI, senior academics (from the UK and abroad), representatives from industry, an existing National Facility Manager and is chaired by an independent senior UK-based aerodynamicist. The current NWTF programme has a duration of 5 years. A mid-term review will review the progress made during the first two and a half years.

References

National Wind Tunnel Facility Wikipedia