Location India North end Lakhipur | Length 121 km (75 mi) South end Bhanga | |
Owner Inland Waterways Authority of India (IWAI) Operator Central Inland Water Transport Corporation (CIWTC) |
National Waterways 6 is a waterway between Lakhipur and Bhanga of the Barak River.
This was announced in the Budget 2013-14. The Inland Waterways Authority of India will execute the project in two phases. The first will be completed by 2016-17 and the second by 2018-19, integrating the waterways in the northeast and helping cargo transport through Assam, Nagaland, Mizoram, Manipur, Tripura and Arunachal Pradesh.
References
National Waterway 16 Wikipedia(Text) CC BY-SA