Girish Mahajan (Editor)

Nanning Rail Transit

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Number of lines
  
1

Transit type
  
Rapid transit

Locale
  
Nanning

Number of stations
  
25

Began operation
  
June 28, 2016

Operator(s)
  
Nanning Rail Transport Limited

System length
  
32.1 km (19.9 mi) + 37.3 km (23.2 mi) under construction

Ride nanning rail transit


Nanning Rail Transit or Nanning Metro is a rapid transit system under construction in Nanning, the capital of Guangxi Zhuang Autonomous Region. Line 1 officially started construction on December 29, 2011. The first section from Nanhu to Nanning East Railway Station (11.2 km) began operation June 28, 2016. The full 32.1 km long with 25 stations Line 1 opened on December 28, 2016. Line 2 started construction in 2012 with a 2017 deadline. It is planned that by 2030 there will be eight lines.

References

Nanning Rail Transit Wikipedia