Trisha Shetty (Editor)

Nanhua Dam

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Republic of China

Opening date
  
1994

Impounds
  
Houku River

Phone
  
+886 6 577 2896

Impound
  
Houku River

Location
  
Nanhua, Tainan

Type of dam
  
Earthfill

Height
  
87.5 m (287 ft)

Construction began
  
1988

Address
  
716, Taiwan, Tainan City, Nanhua District

Hours
  
Open today · Open 24 hoursMondayOpen 24 hoursTuesdayOpen 24 hoursWednesdayOpen 24 hoursThursdayOpen 24 hoursFridayOpen 24 hoursSaturdayOpen 24 hoursSundayOpen 24 hours

Similar
  
Zengwen Dam, Wushantou Dam, Mudan Dam, Techi Dam, Wushoh Dam

Nanhua Dam (Chinese: 南化水庫; pinyin: Nánhuà Shuǐkù; Pe̍h-ōe-jī: Lâm-hoà Chúi-khò͘), originally named Houjie Dam (後堀水庫), is a dam across the Houku River, a tributary of the Tsengwen River in southern Taiwan. Located at Nanhua District, Tainan, the dam was built to provide municipal water to Tainan and Kaohsiung City and is operated by the Taiwan Water Corporation. Construction work started in December 1988, and impoundment of the reservoir began in July 1993. A conduit to supply water from the reservoir to Kaohsiung was completed in October 1993 and the entire project was operational in March 1994.

The curved earthfill dam is 87.5 metres (287 ft) high and 511 metres (1,677 ft) long, impounding a reservoir with a capacity of 0.158 cubic kilometres (128,000 acre·ft) and an active or useful capacity of 0.1495 cubic kilometres (121,200 acre·ft). The reservoir naturally receives water from a catchment of 104 square kilometres (40 sq mi), which is not enough to fill it alone. Most of the water is actually diverted through a tunnel from the Qishan River to the east, adding 408 square kilometres (158 sq mi) to the drainage area. The tunnel provides an average of 160.6 million m3 (130,200 acre feet) of water to the reservoir each year.

Because of its location in a mountainous region, Nanhua is prone to heavy sediment accumulation. A small upstream diversion weir was built to send water laden with silt through a bypass tunnel and allow the remaining clear water to enter the reservoir. However, large amounts of silt are still carried into the reservoir during flooding events. In 2009 alone, flooding caused by Typhoon Morakot dumped 17 million m3 (14,000 acre feet) of silt into the reservoir. In February 2010, the Taiwan Water Corporation began the first stage of a two-year sediment removal project at Nanhua.