NORD.LINK

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Norway Germany

Expected
  
2019

Power rating
  
1,400 MW

Partners
  
Statnett, TenneT

From
  
Ertsmyra, Norway

Total length
  
623 km (387 mi)

Passes through
  
North Sea

NORD.LINK wwwstatnettnoGlobalBilderProsjekterTyskland

To
  
Diele or Brunsbüttel, Germany

Type of current
  
High-voltage direct current

NordLink is a proposed subsea HVDC power cable between Norway and Germany. The over 500 kilometres (310 mi) long cable will have a capacity of 1,400 megawatt (MW) and an operational voltage of 500 kV. It is estimated to cost €1.5–2 billion, which was financed in 2015 when Statnett decided to realize the project. The interconnector is planned installed between a new substation at Ertsmyra (near Tonstad) in Norway and Wilster substation in Schleswig-Holstein in Germany. The new connection would be tested in late 2019, and operational in 2020.

The Norwegian state owned company and transmission system operator, Statnett SF, owns 50% of the project, whilst the Dutch transmission system operator TenneT TSO and the German state owned bank KfW own the other half. A cable between Norway and Germany is listed in the EU's projects of common interest (PCI).