Trisha Shetty (Editor)

Mosul–Haifa oil pipeline

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Type
  
Crude oil

Construction started
  
1932

Decommissioned
  
1948 (1954)

Operator
  
Iraq Petroleum Company

Commissioned
  
1935

Length
  
942 km (585 mi)

Mosul–Haifa oil pipeline

The Mosul–Haifa oil pipeline (also known as the Iraq–Haifa pipeline or Mediterranean pipeline) was a crude oil pipeline from the oil fields in Kirkuk, located in the former Ottoman vilayet of Mosul in northern Iraq, through Jordan to Haifa (in mandatory Palestine, now in the territory of Israel). The pipeline was operational between 1935 and 1948. Its length was about 942 kilometres (585 mi), with a diameter of 12 inches (300 mm) (reducing to 10 and 8 inches (250 and 200 mm) in parts), and it took about 10 days for crude oil to travel the full length of the line. The oil arriving in Haifa was distilled in the Haifa refineries, stored in tanks, and then put in tankers for shipment to Europe.

The pipeline was built by the Iraq Petroleum Company between 1932 and 1934, during which period most of the area through which the pipeline passed was under a British mandate approved by the League of Nations. The pipeline was one of two carrying oil from the Baba Gurgur, Kirkuk oilfield to the Mediterranean coast. The double pipeline split at Haditha (Pumping Station K3) with a second line carrying oil to Tripoli, Lebanon, which was then under a French mandate. That line was built primarily to satisfy the demands of the French partner in IPC, Compagnie Française des Pétroles, for a separate line to be built across French mandated territory.

The pipeline and the Haifa refineries were considered strategically important by the British Government, and indeed provided much of the fuel needs of the British and American forces in the Mediterranean during the Second World War.

The pipeline was a target of attacks by Arab gangs during the 1936–39 Arab revolt in Palestine, and as a result one of the main objectives of a joint British-Jewish Special Night Squads commanded by Captain Orde Wingate was to protect the pipeline against such attacks. Later on, the pipeline was the target of attacks by the Irgun.

In 1948, with the outbreak of the 1948 Arab–Israeli War, the official operation of the pipeline ended when the Iraqi Government refused to pump any more oil through it.

Oil pumping stations

These were named in numerical order going westwards, with the stations from Kirkuk to Haditha denoted "K" (after Kirkuk) and the subsequent ones to the Mediterranean coast at Haifa denoted "H" (after Haifa) and those to Tripoli denoted "T".

  • K1 35°30′55″N 044°18′49″E
  • K2 34°54′47″N 043°24′50″E
  • K3 34°04′31″N 042°21′07″E
  • H1 33°47′23″N 041°27′37″E
  • H2 33°22′38″N 040°37′04″E
  • H3 34°04′30″N 042°21′07″E
  • H4 32°30′09″N 038°11′32″E
  • H5 32°10′32″N 037°07′36″E
  • References

    Mosul–Haifa oil pipeline Wikipedia