Samiksha Jaiswal (Editor)

Mon Valley Works Irvin Plant

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Mon Valley Works - Irvin Plant yngfirecomindexphpactiondlattachtopic10019

The Mon Valley Works - Irvin Plant is a steel processing plant operated by U.S. Steel and historically a "hot strip mill" (sometimes referred to as a "steel mill") in the Pittsburgh suburb of West Mifflin, Pennsylvania. The site consists of 650 acres on a hilltop 250 feet above the Monongahela Valley.l The plant has an annual capacity of 2.9 million net tons of steel from an 80" Hot Strip Mill, 84" and 64" Pickle lines, 84" 5-Stand Cold reduction mill, Continuous annealing line, Batch and open-coil annealing facilities, 84" Temper mill, 52" Hot-dip galvanizing line and a 48" Hot-dip galvanizing line,as well as the #11 Shear Line and #17 Recoil line.

History

The mill was announced on May 22, 1937 and opened in phases starting on March 2, 1938 while being dedicated on December 15, 1938 for U.S. Steel and was constructed by Mesta Machinery. U.S. Steel has claimed that construction of the hilltop site required more cubic yards of earth moved (4.4 million cubic yards) than any project other than the Panama Canal. The cost of the construction of the facility was estimated at $63 million ($1.07 billion today). It produced its 80 millionth ton of steel in 1981 with a workforce of 4,000 that year.

In 1943 a Pittsburgh grand jury indicted 4 Carnegie Illinois foremen for destroying records of steel plating tests conducted at Irvin.

Texas Governor Rick Perry made a major televised campaign stop at the plant in October, 2011.

In January, 2012 a large explosion and fire rocked the plant.

President Barack Obama visited the plant in January, 2014 to launch his program on new retirement accounts, signing the myRA at a televised ceremony at the plant.

References

Mon Valley Works - Irvin Plant Wikipedia