Harman Patil (Editor)

Mohawk and Malone Railway

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Dates of operation
  
1892–1913

Successor
  
New York Central

Locale
  
Northern Adirondacks at Tupper Lake Junction

Predecessor
  
Herkimer, Newport and Poland Railway

Track gauge
  
4 ft 8 ⁄2 in (1,435 mm) standard gauge

Previous gauge
  
originally 3 ft (914 mm) gauge

Dr. William Seward Webb's Mohawk and Malone Railway crossed the northern Adirondacks at Tupper Lake Junction, just north of Tupper Lake. Webb was president of the Wagner Palace Car Company. He began by purchasing the 3 ft (914 mm) narrow gauge Herkimer, Newport and Poland Railway, which ran 16 miles (26 km) from Herkimer to Poland, converting its trackage to 4 ft 8 12 in (1,435 mm) standard gauge, and straightening it to avoid multiple crossings of the West Canada Creek. He then had track built from Tupper Lake to Moira and thence to Montreal. This was called variously the Adirondack and St. Lawrence Railroad and the Mohawk and Malone.

After 1893, it was controlled by the New York Central and Hudson River Railroad.

It opened in 1892 from Malone Junction to Childwold Station with a branch from Lake Clear Junction to Saranac Lake. In 1913, it merged with the New York Central and Hudson River Railroad as the "Adirondack Division".

References

Mohawk and Malone Railway Wikipedia