Rahul Sharma (Editor)

Maslenica Bridge (A1)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Carries
  
A1 motorway

Official name
  
Most Maslenica

Design
  
concrete arch bridge

Opened
  
1997

Location
  
Croatia

Body of water
  
Adriatic Sea

Locale
  
Southern Croatia

Maintained by
  
Croatian Motorways Ltd

Total length
  
378 m

Width
  
20 m

Bridge type
  
Arch bridge

Maslenica Bridge (A1) httpsuploadwikimediaorgwikipediacommonsbb

Crosses
  
Maslenica Strait (Adriatic Sea)

Similar
  
Krka Bridge, Drežnik Viaduct, Krk Bridge, Paški most, Franjo Tuđman Bridge

Maslenica Bridge (Croatian: Most Maslenica, but also known as Croatian: Maslenički most) is a 377.6 m (1,239 ft) long reinforced concrete arch bridge spanning Maslenica Strait of the Adriatic Sea, north of Zadar, Croatia, carrying the Croatian A1 motorway. It is located between the Maslenica and Posedarje interchanges of the A1 motorway.

Contents

The bridge comprises a 200-metre (660 ft) span reinforced concrete arch, with an arch rise of 65 metres (213 ft). The arch comprises a box cross section, a double cell of constant depth. The superstructure is continuous across 12 spans, consisting of prestressed girders made monolithic with the in situ cast deck slab and transverse girders.

The bridge is maintained and operated by Croatian Motorways Ltd.

Approximately 1.5 km (0.93 mi) to the south, there is another bridge, carrying D8 state road across the same strait, and this was the original crossing point over the strait. Although that is a completely different structure, carrying a different road, that bridge is also officially called Maslenica Bridge. The bridge carrying the A1 motorway is actually older than the one carrying the D8 road, however since the latter is a replacement for a bridge destroyed in the Croatian War of Independence in 1991, both A1 and D8 bridges are known to be referred to as both old and new Maslenica Bridge.

Construction

The bridge was designed by Jure Radić, and built by Konstruktor, Split, between 1993 and 1996, using free cantilevering with temporary cable-stays. The reinforced-concrete arch was executed in 5 m (16 ft) long segments, matching spandrel column spacing. Prefabricated girders required for the structure were executed and prestressed in a purpose built plant on the site. The same plant was subsequently used to produce Jersey barriers used as bridge protective barriers.

The bridge is significant as it is the first motorway reinforced-concrete arch bridge comprising a substantial span executed in Croatia.

Subsequently wind protection structures have been executed along the motorway section comprising the Maslenica Bridge, since the 15 km (9.3 mi) long section was completely closed to traffic due to strong wind from time to time - for a total of 6 days and 19 hours in 2007, and 13 days and 2 hours in 2006.

Traffic volume

Traffic is regularly counted and reported by Hrvatske autoceste, operator of the bridge and the A1 motorway where the bridge is located, and published by Hrvatske ceste. Substantial variations between annual (AADT) and summer (ASDT) traffic volumes are attributed to the fact that the bridge carries substantial tourist traffic to the Dalmatian Adriatic resorts. The traffic count is performed using analysis of motorway toll ticket sales.

References

Maslenica Bridge (A1) Wikipedia