Commission date 2012 Units operational 230kw/h | Type Hydroelectric | |
![]() | ||
Address 713 St Alkmund's Way, Derby DE1, UK |
Longbridge Weir Hydro Power House is the name given to a hydro-electric dam built on the River Derwent in the City of Derby.
The project was completed by Derwent Hydro in 2013 at a cost of £1.7 million. The station primarily exists to power the city councils offices, however, surplus energy is sold back to the National Grid.
References
Longbridge Weir Hydro Wikipedia(Text) CC BY-SA