Line F (Buenos Aires Underground)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Type
  
Rapid transit

Opened
  
2020 (planned)

Character
  
Rapid transit

Stations
  
13

Status
  
In development

Line length
  
8,600 m

Operator
  
Metrovías

Line F (Buenos Aires Underground) httpsugckn3netioriginhttpwwwbigbangnew

System
  
Buenos Aires Underground

Track gauge
  
1,435 mm (4 ft 8 ⁄2 in)

Terminis
  
Constitución, Plaza Italia

Line F is a planned addition to the Buenos Aires Underground. After some delays, the budget was announced in 2015 for the first phase of construction from Constitución to Córdoba at a total cost of between 700 and 800 million dollars. As of 2015, it is not yet known if construction will be done as a turnkey project or build to order, however construction is due to start in 2016.

Contents

Overview

The line is set to be the most modern in the network, using automatic trains, a Communications-based train control system like the one being installed on Line C, and Platform screen doors. The line is also expected to have the highest ridership figures when compared to the existing lines.

Currently, the second phase of the development is still being defined, since a new railway station is being considered to compliment Retiro railway station, and if Line F is to have access to it, it would mean altering the trajectory of the northern part of the route to connect with Line H further north at the proposed station.

Line E ghost stations

In 2006, it was evaluated whether the two Line E ghost stations (San José vieja and Constitución) could be used as the southern point of Line F, considering they overlapped the line's trajectory. However, it was later decided that Line F would use a completely new tunnel with new stations given the frequency the line is expected to have.