Puneet Varma (Editor)

Line D (Prague Metro)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit

Line D (Czech: Linka D) is a proposed line of the Prague Metro, serving Prague 4 and Prague 12 in the south of the Czech capital. Chronologically the fourth (blue) line in the system, construction was approved in 2013 and should be constructed from 2018 to 2022. The project involves 10.5 kilometres (6.5 mi) of track with 10 stations. As of October 2013 the city of Prague has spent more than 500 million Czech koruna on the project. Construction on Line D was previously expected to start in 2010 and build a route connecting Náměstí Míru with Pankrác. An alternative was proposed in 2012, without building a transfer station at Pankrác, and instead sharing Line C between Nádraží Holešovice and Pankrác. Finally transfer station in Pankrác and continue to Náměstí Míru was approved in 2014. In July 2015 it was decided that the line will be driverless, with start of the construction expected in 2018 and finished in 2022 or 2023.

Proposed stations

  • Náměstí Míru (transfer to Line A)
  • Náměstí bratří Synků
  • Pankrác (transfer to Line C)
  • Olbrachtova
  • Nádraží Krč (Praha-Krč railway station)
  • Nemocnice Krč (Thomayer hospital)
  • Nové Dvory
  • Libuš
  • Písnice
  • Depo Písnice
  • References

    Line D (Prague Metro) Wikipedia