Type Rapid transit Status Under Construction Planned opening 2020 Locale Shenzhen | System Shenzhen Metro Stations 6 Character Rapid transit | |
![]() | ||
Operator(s) SZMC (Shenzhen Metro Group) Terminis Liantang Subdistrict, Yantian District |
Line 8 Shenzhen Metro (Yantian Line)is currently under construction. Line 8 has a length of 12.34 km and a total of 6 stations. It connects the Liantang with Yantian. Line 8 is the first line to serve Yantian. The line may be built as a monorail rather than a traditional metro. Construction may start in 2016, with the line scheduled to open in 2020.
References
Line 8, Shenzhen Metro Wikipedia(Text) CC BY-SA