Line number
  
Line 3 ("Blue metro")

Electrification
  
825 V DC

Stations
  
20

Line length
  
16.5 km (10 mi)

Operating speed
  
80 km/h

Line 3 (Budapest Metro) wwwthinkrailwayscomwpcontentuploads201409

Track gauge
  
1,435 mm (4 ft 8 ⁄2 in)

The Metro 3 (Officially: M3, North-South Line, Unofficially: Blue Line) is the longest line of Budapest Metro. It runs in a general north-south direction parallel to the Danube on the Pest side, roughly following Váci út south from Újpest to the city center, then following the route of Üllői út southeast to Kőbánya-Kispest. Its daily ridership is estimated at 626,179. Like Metro 1, it does not serve Buda.

Contents

Line 3 (Budapest Metro) Budapest Metro Line 3 Metrowagonmash 817172M KbnyaKisp Flickr

History

Line 3 (Budapest Metro) UrbanRailNet gt Hungary gt Budapest Metro Line M3

The first decree for the third line was made in 1968, construction started in 1970, the first section was opened in 1976 with six stations. The southern direction was complemented with five more stations in 1980, and the northern one in 1981, 1984, and 1990 with nine stations, reaching its current length of 20 stations and 16.5 km (10 mi), the longest line in Budapest. Soviet-made 81-717/714 carriages (prevalent in many Eastern Bloc metro systems) operate on this line. Operation started with 4 units in 1976, expanded to 6 units in 1984. Six unit-trains provide space for 1,097 people. It was planned for a daily ridership of 800,000 people.

Line 3 (Budapest Metro) calls tenders for metro Line 3 upgrade

M3 runs in a north-south direction (more exactly, from north-northeast to southeast) through the city and connects several populous microraion with the downtown. It has a transfer station with Line 1 and Line 2 at Deák Ferenc tér, and a transfer station for Line 4 at Kálvin tér.

Scheduled Reconstruction

Line 3 (Budapest Metro) Metro Cars On Budapest39s Line 3 To Undergo AllRound Renovation

Mayor of Budapest Gábor Demszky was warned in 2006 by BKV that the line would soon need reconstruction, but no steps towards this were made before the new mayor István Tarlós took office in 2010. The trains started burning or smoking multiple times, but this has caused neither fatalities nor serious injuries as of yet. Tarlós reacted by ordering the retirement of all trains that were more than 40 years old. He also started the reconstruction of the tracks, because they were also reported as hazardous. In 2014 the mayor's administration finished laying out the plans for the complete reconstruction of the line and Viktor Orbán's government allowed the local government to finance the reconstruction of the trains by taking up loans. Repayment of the loans was guaranteed by the national government in case the municipal government was not able to pay.

Line 3 (Budapest Metro) ISC 2010 June 79 2010 Ramada Plaza Hotel Budapest Hungary

The municipal government requested EU funds to finance the reconstruction of the underground infrastructure (tunnels and stations), the national government assured it would provide financing in case no or less EU funds were obtained than the necessary amount.

Line 3 (Budapest Metro) UrbanRailNet gt Hungary gt Budapest Metro Line M3

Scheduling the reconstruction of Metro Line 3 was finished by February 2016, according to which the project must finish by September 30, 2019. The line is going to be reconstructed in two phases: first the routes north of Lehel tér and south of Nagyvárad tér will be reconstructed, then the section between those two stations.

The first metro carriage was handed over in January 2016 to the Russian Metrowagonmash (the original manufacturer) to be reconstructed. Tarlós had preferred buying new carriages, but he had been overwritten by the Orbán-government.

The prototype of the reconstructed carriages was delivered on May 26, 2016.

References