Trisha Shetty (Editor)

Line 3, Chongqing Rail Transit

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Type
  
Straddle-beam monorail

Status
  
Ltd Operation

Stations
  
45

System
  
Chongqing Rail Transit

Opened
  
29 Sept 2011

Line 3, Chongqing Rail Transit httpsuploadwikimediaorgwikipediacommonsthu

Daily ridership
  
682,800 (2014 Daily Avg.) 1,080,000 (2016 Peak)

Operator(s)
  
Chongqing Rail Transit Corp., Ltd

Terminis
  
Jiangbei Airport Station, Yudong Station

CRT Line 3 (and the branch line branded as Airport Line) runs from north to south, linking the districts separated by Chongqing's two main rivers, the Yangtze (Chang Jiang) and Jialing rivers. The first phase of the line began construction on 5 April 2007. The initial segment from Lianglukou to Yuanyang (18 stations, 17.5 km (10.9 mi)) opened on September 29, 2011, with a northern extension from Yuanyang to Jiangbei Airport opening on December 30, 2011 and a southern extension from Ertang to terminus Yudong on December 28, 2012. At 55.5 km (34.5 mi), plus 9.97 km (6.20 mi) for the Jurenba branch line opened on December 28, 2016, Line 3 is the longest single monorail in the world by track length. Line 3 is also the world's busiest monorail line with a daily ridership of over 675,000 passengers per day.

There are interchange stations in central Yuzhong district for transfer to the Jeifangbei CBD with Line 1 at Lianglukou and with Line 2 at Niujiaotuo.

Service routes

  • Yudong — Jiangbei Airport
  • Jiugongli — Longtousi
  • Sigongli — Jiangbei Airport
  • Bijin — Jurenba
  • References

    Line 3, Chongqing Rail Transit Wikipedia