Type Rapid transit Status Operational Services 1 Locale Shenzhen | System Shenzhen Metro Stations 29 Daily ridership 247,500 | |
![]() | ||
Terminis Xinxiu Station, Chiwan Station |
Line 2 (Shekou) (simplified Chinese: 二号线; traditional Chinese: 二號線; pinyin: Èrhào Xiàn; Jyutping: Ji6 Hou6 Sin3), also known as Shekou Line(蛇口线; 蛇口線; Shékǒu xiàn; Se4 Hau2 Sin3), of the Shenzhen Metro runs eastward from Chiwan to Xinxiu. It opened on 28 December 2010.
Contents
Line 2 is the only line in Shenzhen solely with underground stations that are inclusively in Shenzhen Special Economic Zone before the opening of Line 7 and Line 9. However, it is the least used line in the system with only 247,500 passengers a day, peaking at 385,500 on 5 May 2014.
First stage
The first stage of Line 2 runs from Chiwan to Window of the World, it is 15.514 km long, and these 12 stations are all underground.
This section opened on 28 December 2010.
Second stage
The second stage runs from Window of the World to Xinxiu, it is 20.65 km long, and has 17 stations.
The second stage of Line 2 started trial operation on 28 June 2011.