Type Rapid transit Status In operation Line length 25,739 m Stations 24 | System Suzhou Rail Transit Opened Apr. 28, 2012 Character Rapid transit | |
Daily ridership 160,000 (average)
310,000 (maximum) Owner Suzhou Rail Transit Co., Ltd Terminis Zhongnan Jie Station, Mudu Station |
1 line 1 suzhou rail transit leqiao station 2016 9
Line 1 is the main west-east line of Suzhou Rail Transit, and it started service on Apr. 28, 2012. Line 1 is the first rapid transit line in Suzhou and this line is operated by Suzhou Rail Transit Co., Ltd.
Contents
Construction
Construction on Line 1 began on December 26, 2007 and was scheduled to be completed by 2012. It is a line running generally east-west, from Mudu in western Suzhou to Zhongnan Street in Suzhou Industrial Park. It will be 25 km long with 24 stations.
On December 30, 2011 the first 21 cars for Line 1 have been delivered.
Fares
Fares start at 2.00 Yuan (¥) and can take 6 kilometers (km),6 km to 16 km every additional 1.00 Yuan (¥) can take 5 km,16 km to 30 km every additional 1 Yuan (¥) can take 7 km,30 km and above every additional 1 Yuan (¥) can take 9 km,so the whole journey of Line 1 is 6 Yuan (¥).
From a select start station to a select destination station, please see the following fare table.