Trisha Shetty (Editor)

Line 1, Ningbo Rail Transit

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Type
  
Rapid transit

Status
  
Operational

Owner
  
Ningbo

Locale
  
Ningbo

System
  
Ningbo Rail Transit

Opened
  
May 30, 2014

Character
  
Rapid transit

Stations
  
29

Line 1, Ningbo Rail Transit httpsuploadwikimediaorgwikipediacommonsthu

Operator(s)
  
Ningbo Rail Transit Co.,Ltd.

Line length
  
46.165 km (28.69 mi) (total)

Terminis
  
Xiapu Station, Gaoqiao West Station

Line 1 of Ningbo Rail Transit (Chinese: 宁波轨道交通1号线) is a rapid transit line in Ningbo. It stretches from Gaoqiao Town in the west towards Qiuga Town in the east of the city and reaches Beilun. The line started service on May 30, 2014.

Route

Line 1 is the first metro line serving Ningbo. It stretches in west-east direction, starting from Gaoqiao Town in the west as a viaduct and turns into underground tunnel when it approaches Haishu District. After that the tunnel stretches under Zhongshan Road, a main road in Ningbo, crossing Fenghua River and enters Jiangdong District. Then it passes Ningbo East New Town and then go overground. Finally the metro line extends into Beilun District and ends there. The section between Gaoqiao and Ningbo East New Town has been constructed as the first phase which started service on May 30, 2014. The rest section from Ningbo East New Town to Beilun District opens on March 19, 2016. The line has 28 stations in total, of which 12 are elevated and the rest are underground. Till June 2014, 20 stations of Line 1 are operational.

References

Line 1, Ningbo Rail Transit Wikipedia