Samiksha Jaiswal (Editor)

Line 1, Nanjing Metro

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Type
  
Rapid transit

Opened
  
August 12, 2005

Number of tracks
  
2

Stations
  
31

Status
  
In operation

Line length
  
46.8 km (29.1 mi)

Character
  
Rapid transit

Line 1, Nanjing Metro httpsuploadwikimediaorgwikipediacommonsthu

Daily ridership
  
763,000 (2014 Avg.) 1,087,000 (2014 Peak)

Terminis
  
Maigaoqiao Station, China Pharmaceutical University Station

Line 1 of the Nanjing Metro (Chinese: 南京地铁1号线; pinyin: Nánjīng Dìtiě Yī Hào Xiàn) is the first operating metro line in the Nanjing Metro system, inaugurated on September 3, 2005. After the opening of the 25.08 km-long south extension line on May 28, 2010, the total length of Line 1 is now 46.8 km.

Contents

Route

This line mainly runs in a north-south direction. It starts at Maigaoqiao station in the north, and continues southwards towards China Pharmaceutical University station which is located at the southeastern side of Nanjing.

Of the total 21.72 km of the main line track, 14.33 km of the Line 1 track runs underground, while 7.39 km of the track run on or above the ground. Of the total 16 stations, 11 of them are underground stations while the other 5 are either ground or elevated stations.

The southern extension line of Metro Line 1 has a total length of 25.08 km with 15 stations (excluding Andemen Station). Of the total 15 stations, 8 of them are underground and the other 7 are all elevated stations.

North

There are plans for Line 1 to extend northwards to Erqiao Park Station. The first phase of the extension line will cover a length of 5 km with 4 elevated stations.

References

Line 1, Nanjing Metro Wikipedia