Samiksha Jaiswal (Editor)

Kunlun Shan (998)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Name
  
Kunlun Shan

Laid down
  
June 2006

Construction started
  
June 2006

Length
  
210 m

Displacement
  
22.68 million kg

Ordered
  
?

Commissioned
  
30 November 2007

Launched
  
21 December 2006

Weight
  
25,400 tons

Beam
  
28 m

Kunlun Shan (998) httpsuploadwikimediaorgwikipediacommonsthu

Operator
  
People's Liberation Army Navy

Builder
  
Hudong-Zhonghua shipyard

Kunlun shan 998 amphibious transport dock qiandaohu 886 replenishment ship


Kunlun Shan (998) is the lead ship of the People's Republic of China's Type 071 amphibious transport dock Yuzhao class. The ship was laid down in the Hudong-Zhonghua Shipbuilding in Shanghai in June 2006 and was launched on 21 December 2006. After finishing trials the ship was commissioned to the South Sea Fleet on 30 November 2007, at Zhanjiang Naval Base. Its estimated production cost is USD 300 million .

Contents

Use

On 9 March 2014, the ship was deployed in the search for the missing Malaysia Airlines Flight 370.

References

Kunlun Shan (998) Wikipedia