Harman Patil (Editor)

Kolkata Metro Line 5

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Type
  
Rapid transit

Status
  
Under Construction

Stations
  
11

System
  
Kolkata Metro

Locale
  
Kolkata India

Kolkata Metro Line 5

Termini
  
Baranagar (south) Barrackpore (north)

The Baranagar-Barrackpore Metro (Line 5) (12.40 km) was meant to enable a quicker commute from the northern suburbs to South Kolkata.

References

Kolkata Metro Line 5 Wikipedia