Country
  
Estonia

Status
  
Operational

Secondary fuel
  
Light fuel oil

Construction began
  
2011

Location
  
Kiisa

Primary fuel
  
Natural gas

Owner
  
Elering

Construction cost
  
135 million EUR

Kiisa Power Plant

Commission date
  
November 2013 (1st unit) June 2014

The Kiisa Power Plant is an emergency reserve power plant in Kiisa, Estonia, about 25 kilometres (16 mi) from Tallinn. As an emergency plant, it operates only in the case of a network failure or capacity shortfall, and it does not participate in the everyday electricity market. The power plant is owned and operated by the Estonian transmission system operator Elering.

The plant is supplied by Wärtsilä and it is based on Wärtsilä 20V34DF engines fuelled by natural gas as a primary fuel and light fuel oil as a back-up fuel. It consist of two generation units with capacity of 110 MW and 140 MW accordingly. Each of units is a set of 10-MW generators. Construction started in 2011 and the first unit was commissioned in January 2014 and the second unit was commissioned in July 2014. Its total capacity 250 MW is equal to one sixth of the maximum consumption of Estonia.

The power plant is located next to the Kiisa 110/330 kV substation, which is connected to the Estonia's main transmission lines. As an emergency reserve power plant, it should reach full output within 10 minutes. It will be fully automatic without permanent personnel on site. The plant is connected with the natural gas grid. In addition, it has an oil terminal with tanks' capacity up to 14,000 cubic metres (490,000 cu ft) of diesel.