Puneet Varma (Editor)

Hythe (RHDR) railway station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Place
  
Hythe

Grid reference
  
TR153347

Platforms
  
3 open (originally 4)

Area
  
Shepway

Managed by
  
RHDR

16 July 1927
  
Opened

Hythe (RHDR) railway station

Address
  
Hythe CT21 6LD, United Kingdom

Similar
  
Romney - Hythe and Dymchur, Dymchurch railway station, Dungeness railway station, Burmarsh Road railway st, St Mary's Bay railway station

Hythe station is the northern terminus of the Romney, Hythe and Dymchurch Railway. The station has curved platforms, loco release road, former engine shed (now an independent engineering works), signalbox with 16 lever frame, and a turntable. In terms of passenger bookings Hythe is the busiest station on the railway.

Adjacent to the station the former station master's house is now a private residence. Situated between the station and the Royal Military Canal is The Light Railway Restaurant which was originally built by the railway company but sold before it was even completed. It was finally repurchased by the railway in February 2015.

The station is situated to the south of the town on the A259 road to Folkestone, and follows the same alignment as the Royal Military Canal.

The ancient Cinque Port offers shopping facilities with restaurants, cafes, pubs, banks, supermarkets, antique shops, general shops, swimming baths, gardens, parks and a seafront.

Platforms

Of the three platforms, only numbers 2 and 3 are normally used for arrivals and departures, number 1 being used mainly for stock storage as it has no loco release facility. Prior to the 1970s resignalling it was used for occasional departures, although today this happens very rarely and it is used largely for non-passenger trains.

As originally built the station had a fourth platform to the south with its own loco release road, and platform three had no release facility. It seems the original design (as with the Dymchurch bay platform) assumed trains would arrive and then shunt into a different departure platform to release the loco and turn. In the 1920s the layout was altered to make operation more efficient. Platform 4 disappeared in the resignalling, as platforms were extended and has now been incorporated into the car park.

References

Hythe (RHDR) railway station Wikipedia


Similar Topics