Suvarna Garge (Editor)

Hamley Bridge Gladstone railway line

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Status
  
Closed

Continues as
  
Wilmington line

Hamley Bridge-Gladstone railway line httpsuploadwikimediaorgwikipediacommonsthu

System
  
South Australian Railways

Termini
  
Hamley Bridge Gladstone

Continues from
  
Roseworthy-Peterborough line

Opened
  
Hamley Bridge-Balaklava: 15 January 1880 Balaklava-Blythe: 14 March 1876 Blythe to Gladstone: 2 July 1894

The Hamley Bridge-Gladstone railway line was a railway line on the South Australian Railways network. It extended from a junction at Hamley Bridge on the Roseworthy-Peterborough line (which provided connection through to Adelaide) through Balaklava and Brinkworth to Gladstone.

History

The earliest part of the narrow gauge Hamley Bridge-Gladstone line opened from Balaklava to Blythe on 14 March 1876 as part of the Port Wakefield line. On 15 January 1880, the line opened from Hamley Bridge to Balaklava. It was extended north from Blythe to Gladstone on 2 July 1894 where it joined the Port Pirie-Cockburn and Wilmington lines. The line was gauge converted to 5 ft 3 in (1,600 mm) on 1 August 1927. The line from Gulnare to Gladstone closed on 11 May 1988, followed by the Balaklava to Gulnare section on 29 March 1989.

As Balaklava railway station was originally on the Port Wakefield to Blythe line, before the railway from Hamley Bridge was built, and the new line entered the town from the south-east, trains using the route between Gladstone and Adelaide needed to change direction at Balaklava, as both the north and south lines entered the station from the east, with Port Wakefield being to the west.

The "Western System" included the railway from Hamley Bridge to Gladstone, along with the lines from Balaklava through Port Wakefield, Kadina and Wallaroo, and the line from Kadina through Snowtown to Brinkworth. All of these lines were prepared for conversion from narrow to broad gauge in the mid-1920s, with the switch made on 1 August 1927.

References

Hamley Bridge-Gladstone railway line Wikipedia