Kalpana Kalpana (Editor)

Halemba Power Station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Official name
  
Elektrownia Halemba

Location
  
Halemba, Ruda Śląska

Units operational
  
200 MW

Decommission date
  
1 April 2012

Country
  
Poland

Status
  
Operational

Construction began
  
1943

Halemba Power Station

Owner(s)
  
Południowy Koncern Energetyczny S.A.

Address
  
41-706 Ruda Slaska, Poland

Halemba Power Station (Polish: Elektrownia Halemba) is a coal-fueled power plant in Halemba district of Ruda Śląska, Silesian Voivodeship, Poland.

The construction of the plant begun in 1943, organized by Nazi German administration of occupied Poland, and using forced labor from Auschwitz Concentration Camp. After the war the plant was finished by the authorities in the People's Republic of Poland, and started operation in 1962. Since 2006 it has reduced operation, and was decommissioned on 1 April 2012.

References

Halemba Power Station Wikipedia