Kalpana Kalpana (Editor)

HMS Ariel (1897)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Name
  
HMS Ariel

Laid down
  
23 April 1896

Fate
  
Wrecked, 19 April 1907

Launched
  
5 March 1897

Draft
  
2.34 m

Yard number
  
314

Commissioned
  
October 1898

Construction started
  
23 April 1896

Length
  
64 m

HMS Ariel (1897) httpsd1k5w7mbrh6vq5cloudfrontnetimagescache

Ordered
  
1895 – 1896 Naval Estimates

Builder
  
John I. Thornycroft & Company

HMS Ariel was a two funnel, 30 knot destroyer ordered by the Royal Navy under the 1895 – 1896 Naval Estimates. Named after Shakespeare's "airy spirit", or the biblical spirit of the same name, she was the ninth ship of the name to serve in the Royal Navy. She was launched in 1897, served at Chatham and Malta, and was wrecked in a storm in 1907.

Contents

Construction

The British Admiralty ordered two "thirty-knotter" torpedo boat destroyers from John I. Thornycroft & Company as part of the 1895–96 shipbuilding programme for the Royal Navy. The two ships, Angler and Ariel were repeats of the four thirty-knotters ordered from Thornycroft under the previous year's programme (Desperate, Fame, Foam and Mallard) and as such shared the same design features.

Thornycroft's design had three water-tube boilers supplying steam at 220 pounds per square inch (1,500 kPa) to 2 four-cylinder triple-expansion steam engines, rated at 5,700 indicated horsepower (4,300 kW), and had two funnels. The ship was 210 feet 0 inches (64.01 m) long overall and 208 feet 0 inches (63.40 m) at the waterline, with a beam of 19 feet 6 inches (5.94 m) and a draught of 5 feet 6 inches (1.68 m). Displacement was 272 long tons (276 t) light and 352 long tons (358 t) full load, while crew was 63 officers and men. The ships were required to reach a speed of 30 knots (56 km/h; 35 mph) during sea trials and carry an armament of a single QF 12 pounder 12 cwt (3 in (76 mm) calibre) gun, backed up by five 6-pounder guns, and two 18-inch (450 mm) torpedo tubes. An arched turtleback forecastle was to be fitted.

She was laid down as yard number 314 on 23 April 1896 at Thornycroft's shipyard at Chiswick on the River Thames and was launched on 5 March 1897. During sea trials, she reached 30.82 knots (57.08 km/h; 35.47 mph) over the measured mile and 30.194 knots (55.919 km/h; 34.747 mph) in the three-hour trial. Ariel was completed in October 1898.

Operational history

After commissioning Ariel was assigned to the Chatham Division of the Harwich Flotilla where she participated in the exercises with Angler in 1899. The following year she was part of the Medway Instructional Flotilla. Lieutenant Henry Cyril Royds Brocklebank was appointed in command on 1 March 1900.

She was commissioned at Chatham on 22 August 1901 by Lieutenant Commander Leopold George Darker Way, with a complement of 60 officers and men, to serve at the Mediterranean station. Upon arrival at Gibraltar she replaced Hornet as tender to the receiving ship Cormorant. On 3 December 1901 she arrived in Malta from Gibraltar, and in early March 1902 Lieutenant V. E. B. Phillimore was appointed in command.

Loss

On 19 April 1907, Ariel was wrecked when she ran aground on a breakwater just outside Grand Harbour, Valletta, Malta, at night. All of her crew survived, and were rescued by the destroyer Bruiser.

References

HMS Ariel (1897) Wikipedia