Status Operational Owner China Guodian Corporation | ||
![]() | ||
Construction began January 1988 (1,200 MW Phase 1)June 1996 (1,800 MW Phase 2)December 2006 (2,000 MW Phase 3) Commission date November 1994 (1,200 MW Phase 1)September 2000 (1,800 MW Phase 2)June 2009 (2,000 MW Phase 3) Similar Tuoketuo Power Station, Longtan Dam, Futtsu Power Station, Chita Power Station, Kashima Power Station |
The Guodian Beilun Power Station (Chinese: 国电北仑发电厂; pinyin: Guódiàn Běilún Fādiànchǎng) is a coal-fired power station in Beilun District, Ningbo, Zhejiang, China. With an installed capacity of 5,000 MW, it is the fourth largest coal-fired power station in the world. The station generates energy by five 600 MW and two 1,000 MW units, which is fuelled by coal.