Country Lithuania Status Operational Construction cost 126 mil. EUR Operator Fortum Heat Lietuva | Location Klaipėda Commission date 2013 Construction began 2011 | |
![]() | ||
Official name Fortum Klaipėda termofikacinė elektrinė |
Fortum Klaipėda Combined Heat and Power Plant is power plant in Klaipėda, Lithuania and it uses biomass and waste to produce energy. It built in Klaipėda Free Economic Zone by Fortum Heat Lithuania which belongs to Finnish energy company Fortum.
Lithuanian president Dalia Grybauskaitė and Finnish president Sauli Niinistö both participated in the opening ceremony of the plant.
References
Fortum Klaipėda Combined Heat and Power Plant Wikipedia(Text) CC BY-SA