Trisha Shetty (Editor)

Fierza Hydroelectric Power Station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Location
  
Albania

Type of dam
  
Rock-fill dam

Length
  
380 m (1,250 ft)

Opened
  
1978

Surface area
  
72.5 km²

Construction began
  
1971

Opening date
  
1978

Impounds
  
Drin River

Height
  
167 m

Catchment area
  
11,829 km²

Create
  
Fierza Reservoir

Fierza Hydroelectric Power Station httpsd1k5w7mbrh6vq5cloudfrontnetimagescache

Official name
  
Hidrocentrali i Fierzës

Similar
  
Skavica Hydro Power Pl, Vau i Dejës Hydroelectric Power St, Koman Hydroelectric Power St, Drin, Messochora Dam

The Fierza Hydroelectric Power Station (Albanian: Hidrocentrali i Fierzës) is a large hydroelectric power station on the Drin River, in Albania.

Map of Fierza Hydroelectric Power Station, Albania

Fierza is the upper HPP (Hydro Power Plant) of the Drin River cascade. Based on the installed power capacity, position and the volume of the reservoir, Fierza plays a key role for the exploitation, regulation and safe operation of Drin cascade.

Work for its construction began in 1970. The first power unit become operational in 1978 and the plant wad fully operational in 1980. Fierza HPP was built with equipment mostly from China but on the concepts of Albanian engineers. Around 14, 000 workers, engineers and specialist were involved in the construction of the plant.

Fierza is a HPP with a Rock-fill dam with a clay core and reservoir. When it was built, Fierza was the second in Europe for the height of its type. The dam has a total volume of 8 million m3.

This rock-fill dam measures 167 m (548 ft) in height, and 380 m (1,250 ft) in length along the crest. Construction began in 1971 and was completed seven years later in 1978. The dam is one of the three hydroelectric dams on the Drin River. The reservoir was filled with water between 1978 and 1981.

The four units installed in the plant have "Francis" vertical turbines with 125 MW power each; 3-Phase synchronous generators of 13.8kV voltage; and lifting transformers 13.8kV/242 kV for the connection with the transmission substation.

The annual output of Fierza HPP averages in 1,330 GWh, that represent approximately 33% of Drin cascade production.

The importance of Fierza, beside energy production, relates on the capacity of its lake which regulates the annual inflowws and increase the efficient use of the Drin cascade.