Type Onshore Construction cost 550 million USD | Status Operational Nameplate capacity 250.5 MW Units operational 167 | |
![]() | ||
Location |
The Eurus Wind Farm is a wind farm located in Juchitán de Zaragoza, Oaxaca, Mexico. The largest wind farm in Latin America, the partnership between Cemex and Acciona Energia cost US$550 million to build. Its 167 wind turbines combine to generate 250.5 megawatts (MW), sufficient power to supply about half a million people. By contrast with traditional means of power, it may reduce annual carbon dioxide emissions by 600,000 metric tons.
References
Eurus Wind Farm Wikipedia(Text) CC BY-SA