Length 318.8 km | ||
![]() | ||
From: Târgu Mureș (junction with A3) Major cities Iași, Târgu Mureș, Târgu Neamț, Târgu Frumos, Sovata |
The East–West Motorway, labeled as A8 Târgu Mureș–Iași (Romanian: Autostrada Est-Vest (A8)), is a planned motorway in Romania, that will cross the Eastern Carpathians to connect the historical regions of Moldavia and Transylvania. Pre-feasibility studies performed in 2007 were followed by feasibility studies in 2009-2011. As of February 2015, the feasibility study revision and update is being conducted by private contractors.
With a total length of 318.8 kilometres (198.1 mi), and an estimated cost of 4.07 billion €, A8 will have the following route (from east to west): Ungheni - border with Moldova, Iași, Târgu Frumos, Pașcani, Târgu Neamț, Poiana Largului, Tulgheș, Ditrău, Sovata, Târgu Mureș - junction with A3 motorway.