Cortlandt Street (IRT Broadway–Seventh Avenue Line)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Division
  
A (IRT)

Structure
  
Underground

Borough
  
Manhattan

Tracks
  
2

Services
  
no regular service

Opened
  
1 July 1918

Rebuilt
  
2018 (projected)

Cortlandt Street (IRT Broadway–Seventh Avenue Line) httpsuploadwikimediaorgwikipediaenthumb7

Address
  
180 Greenwich Street, New York, NY 10007 United States

Line
  
IRT Broadway–Seventh Avenue Line

Transit connections
  
PATH: NWK–WTC, HOB–WTC (at World Trade Center)

Locale
  
Financial District, World Trade Center site

Similar
  
World Trade Center site, 145th Street, Chambers Street, Rector Street, Chambers Street–World Trade Ce

Cortlandt Street (also known as Cortlandt Street–World Trade Center) is a temporarily closed station on the IRT Broadway–Seventh Avenue Line of the New York City Subway in Lower Manhattan. The station was demolished after sustaining heavy damage during the September 11 attacks and is currently being reconstructed as a part of the World Trade Center Transportation Hub.

Contents

Station layout

The original station was originally located under Cortlandt and Greenwich streets, with a standard two side platform layout with two tracks, the rebuilt station will be built directly under the National September 11 Memorial & Museum, under Greenwich Street. It will be connected to the Cortlandt Street (BMT), Chambers Street–World Trade Center/Park Place, and World Trade Center (PATH) stations to become the World Trade Center Transportation Hub.

Early history

The station was named after Cortlandt Street, which formerly ran east and west from Broadway to West Street in Lower Manhattan, nicknamed "Radio Row" because of the many electronics dealers on the street. The station was constructed and opened in 1918. It was originally located under Cortlandt and Greenwich streets, with a standard two side platform layout with two tracks and mosaic decorations by Squire J. Vickers depicting a ship.

In 1965, Cortlandt Street west of Church Street was demolished to create the superblock of the World Trade Center. The station, with entrances at Vesey Street and inside the World Trade Center concourse, was not particularly close to the remaining block of Cortlandt Street. The old tiling and mosaics disappeared and were replaced with 1970s-style tiles, which essentially was varnished, tan-colored bricks. One of the Vickers mosaics is preserved in the New York Transit Museum.

September 11 attacks

The station and the surrounding subway tunnels were severely damaged in the September 11, 2001 terrorist attacks from the collapse of Two World Trade Center, resulting in the closure of the line south of Chambers Street. The steel I-beams of the station were crumpled and the station roof began to collapse. To quickly restore service to Rector Street and South Ferry stations to the south, workers demolished the remainder of the station and built walls where the platforms used to be. About 1,000 feet (300 m) of tunnels and trackage, including 575 feet (175 m) of totally destroyed tunnels and tracks in the vicinity of the station site as it traversed Ground Zero, were entirely rebuilt. However, officials wanted only to reopen Rector and South Ferry stations at the time, and Cortlandt Street was to be closed completely, with no replacement station. Eventually, it was decided that the Cortlandt Street station was to be demolished and rebuilt as part of the greater World Trade Center reconstruction project, since Cortlandt Street was such a vital station in the area and since a permanent closure would have been unfeasible. The line reopened on September 15, 2002, with trains bypassing the site of the Cortlandt Street station.

The northern entrance at Vesey Street was under a staircase to the plaza above. After the World Trade Center collapse on September 11, the staircase still stood and became known as the Survivors' Staircase. The stairs were moved into the National September 11 Museum in July 2008.

Reconstruction and delays

In October 2008, the Port Authority of New York and New Jersey (PANYNJ) stated in a report that it had come to an agreement with the MTA on reconstructing the Cortlandt Street station. The MTA would pay the Port Authority to rebuild the station as part of the Port Authority's World Trade Center Transportation Hub contract, in order to make the construction process more efficient. The Port Authority was set to complete underpinning and excavation under the tunnel structure by the second quarter of 2010, and start basic construction of the station during the 3rd quarter. Station finishes would start during the second quarter of 2011. In the 2010–2nd Quarter report, the Port Authority of New York and New Jersey confirmed that excavation under the tunnel structure of the World Trade Center site was nearly complete, and that construction of the Cortlandt Street station would begin during the 3rd quarter of 2010. As of September 2011, work continues on the station mezzanine and platforms.

Disputes between the PANYNJ and the MTA over who would pay for the renovation had caused the planned opening of the station to be delayed from 2014 to 2018. In 2013, the PANYNJ awarded a contract to rebuild the station. The first phase of the demolition of the original station cost $19 million. As of December 2013, the area is still being rebuilt, and as of February 2015, the PANYNJ and the MTA have agreed to finish the station. The part of the Broadway–Seventh Avenue Line on which Cortlandt Street station is located, south of Chambers Street, will probably be partially or intermittently closed between 2015 and 2018 to allow the station to resume construction.

The tracks are walled off for the protection of the workers while the construction is underway. For a time in the late 2000s and early 2010s, the 1 train used an enclosed elevated structure briefly when passing the site of the station as a result of the massive excavation in the World Trade Center site. Station finishes, including tiles and lighting, will be installed in the station between May 2015 and 2018. The PANYNJ is set to give "full access" to the station to the MTA in June 2017 once the temporary World Trade Center PATH entrance is demolished and the Cortlandt Street station foundation is poured. The reconstruction of the station is set to cost $101 million and will include new Americans with Disabilities Act-compliant entrances with elevators. A $1 million weaving-based artwork by Ann Hamilton will be installed in the station by MTA Arts and Design; this artwork would feature words, from an undetermined historical document, engraved into the station walls. Once the station is open, it will have an exit/entrance through the World Trade Center Transportation Hub, giving direct access from the subway to the PATH. There will also be an out-of-system connection to the Fulton Center via the WTC Hub.