Line(s) Greenbush Line Fare zone 4 Platforms in use 1 | Disabled access Yes Opened 31 October 2007 Tracks 1 | |
![]() | ||
Location 115 Chief Justice Cushing Highway
Cohasset, Massachusetts Parking 410 spaces ($4.00 fee)
10 accessible spaces Passengers (2013) 391 (weekday inbound average) Address Chief Justice Cushing Hwy, Cohasset, MA 02025, USA Similar Nantasket Junction, North Scituate, West Hingham, Weymouth Landing/East Braintree, Greenbush |
Cohasset is a commuter rail station on the MBTA Commuter Rail Greenbush Line, located off Chief Justice Cushing Highway (Route 3A) west of downtown Cohasset, Massachusetts. The station was opened with the line on October 31, 2007 - the first rail service to Cohasset since 1959. Cohasset station is fully handicapped accessible.
History
The Old Colony Railroad and successor New Haven Railroad operated four stations in Cohasset: North Cohasset (at Hull Street), King Street, Cohasset (at Pleasant Street) and Beechwood (at Beechwood Street). No station was located at the modern site, which is between populated areas. However, it was the site of the junction with the Whitney Spur, which led to the Hingham Naval Ammunition Depot Annex (open from 1941-1962). The New Haven ended passenger services on Old Colony Division on July 30, 1959.
After the closure of the Annex in 1962, it was acquired by the state Department of Conservation and Recreation (DCR) and converted to Wompatuck State Park beginning in 1969. In 2003, the DCR sold the land for the station and parking lot to the MBTA in exchange for the construction of a rail trail on the former rail spur. The station opened with the rest of the Greenbush Line on October 31, 2007. It was intended as a park-and-ride station, with a large parking lot but few pedestrian connections to neighborhoods. The 1.5-mile (2.4 km) Whitney Spur Rail Trail opened from the station to the park around the same time.
However, a gate blocked access from the trail to the northwest section of the park, which still had several dangerous abandoned buildings. After years of requests, demolition of the buildings began in April 2014. The northwest section opened in November 2014 and the gate was removed. With the trail now serving as usable access to the park, 20 spaces in the station lot were dedicated for park users.