Constructed November 2009 | Length 19 km Major city Nungambakkam | |
![]() | ||
Existed: November 2009 – present History: Completion scheduled for 2013 |
Live pon radhakrishnan on chennai port maduravoyal expressway project
The Chennai Port – Maduravoyal Expressway is an 19 kilometres (12 mi) elevated expressway under construction in the city of Chennai, India. The corridor begins at Chennai Port Gate no. 10 and travels along the bank of the Cooum River till it reaches Koyambedu and along the median of NH4 thereon till it reaches Maduravoyal.
Contents
- Live pon radhakrishnan on chennai port maduravoyal expressway project
- Map of Chennai Port E28093 Maduravoyal Expy Chennai Tamil Nadu
- Chennai port maduravoyal expressway project shelved in aiadmk rule k veeramani thanthi tv
- History
- Project Details
- Alignment
- Interchanges
- Entry Ramps
- Exit Ramps
- Project status
- References
Map of Chennai Port %E2%80%93 Maduravoyal Expy, Chennai, Tamil Nadu
Chennai port maduravoyal expressway project shelved in aiadmk rule k veeramani thanthi tv
History
An 18.3-kilometre (11.4 mi) long, 20-metre (66 ft) wide elevated road project connecting the port with Maduravoyal is under construction at a cost of ₹ 16,550 million. Upon completion, this will be the country's longest four-way elevated expressway. The project was sanctioned in June 2007 when the Tamil Nadu Government gave its 'in principle' approval to the National Highway Authority of India (NHAI) for the elevated expressway. The project cost then was put at ₹ 14,680 million. In January 2009, the Prime Minister, Dr. Manmohan Singh, laid the foundation stone for the project but the project was put on hold for want of environment clearance. The project has got the environment clearance in February 2011, and during the same month, the port handed over a cheque for ₹ 500 million to the NHAI as part of its contribution to the project. The expressway starts from Gate No. 10 of the Chennai Port near the War Memorial and ends before Maduravoyal Interchange. It would run along the banks of the Cooum up to Koyambedu and would end along the Cooum near the Koyambedu grade separator. From there for a distance of three km up to Maduravoyal the elevated expressway would come up on Poonamallee High Road. There would be a total of four entry and exit ramps as part of the project. While the entry ramps would come up on Sivananda Salai and College Road, the exit points would be provided on Spurtank Road and Kamaraj Salai. The work at the Maduravoyal end began in December 2010. The project is being implemented on a build, own and transfer mode. Of the total project cost of ₹ 16,550 million, ₹ 3,100 million has been set aside for land acquisition and rehabilitation and resettlement of nearly 7,400 people living along the project area. About 1,300 people have been rehabilitated at Okkiam Thoraipakkam. Of 30 hectares to be acquired for the project, only 2 hectares belong to private owners. The project was initially expected to be completed by end of 2013. However, the project has been put on hold.
Project Details
This corridor is implemented under Phase-VII of National Highways Development Project by NHAI. The Feasibility study cum DPR was done by Wilbur Smith Associates. This expressway forms a part of the circular corridor 2 of the High Speed Circular Corridors.
Alignment
Interchanges
Entry Ramps
Exit Ramps
Project status
7 March 2008:
Jan 2009:
June 2009:
July 2010:
September 2010:
April 2012:
February 2014: