Country
  
Turkey

Status
  
Operational

Type of dam
  
Gravity

Construction began
  
January 2008

Purpose
  
Power

Opening date
  
November 2010

Owner
  
ČEZ Group

Impound
  
Peri River

Burç Bendi Dam

Location
  
Burç, Adıyaman district, Adıyaman Province

People also search for
  
Çocuktepe Dam, Beyyurdu Dam

The Burç Bendi Dam is a gravity dam on the Göksu River (a tributary of the Euphrates), near the village of Burç in Adıyaman district, Adıyaman Province, Turkey. Its primary purpose is hydroelectric power generation and it supports a 27.9 MW run-of-the-river power station. Construction on the dam began in January 2008 and it was fully operational by 3 November 2010. The 57 m (187 ft) tall concrete dam withholds a reservoir of 26,600,000 m3 (21,600 acre·ft). Water is diverted through a 536 m (1,759 ft) long tunnel to the power station downstream which contains three 9.3 vertical Kaplan turbine-generators. It is owned and operated by ČEZ Group.

References

Burç Bendi Dam Wikipedia