Puneet Varma (Editor)

Buildwas railway station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Place
  
Buildwas

Grid reference
  
SJ651041

Post-grouping
  
Great Western Railway

Original company
  
West Midland Railway

Area
  
Shropshire

Pre-grouping
  
Great Western Railway

1 February 1862
  
Opened

Platforms in use
  
3

Buildwas railway station httpsuploadwikimediaorgwikipediacommonsthu

Similar
  
Berrington railway station, Coalport West railway st, Cressage railway station, Donnington railway station, Linley Halt railway station

Buildwas railway station was an important bustling junction station after the opening of the Severn Valley Railway on 1 February 1862. Although the station served both the Severn Valley Railway and Wellington to Craven Arms Railway, it was an interchange station in open countryside with no passenger access except by rail.

The station had three platforms, with two platforms at a lower level serving the Severn Valley Railway and one at a higher level serving the Wellington to Craven Arms Railway. At its peak, the station had a total of eleven staff, including the station master. Up to 1923 the area was controlled by two signal boxes, the Station signal box controlling the station area and the Junction signal box controlling the junction between the Severn Valley line and the double track line across the Albert Edward Bridge towards Lightmoor Junction. These were replaced with a single signal box approximately midway between its predecessors in 1923. This box was subsequently enlarged to accommodate a frame containing 113 levers on 9 December 1931. The track layout was altered several times during its existence including the additional CEGB sidings opened in 1932.

The planned closure of the northern end of the Severn Valley Line including Buildwas station pre-dated the Beeching report. Following closure, the station was demolished to make way for Ironbridge B Power Station. Coal for the power station was offloaded close to the site of the original station until the power station stopped generating electricity in November 2015.

The Telford Steam Railway has aspirations to operate to this site, running over the Albert Edward Bridge to a new terminus on or close to the site of Buildwas station.

References

Buildwas railway station Wikipedia


Similar Topics