Trisha Shetty (Editor)

Bucharest Metro Line M6

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit

M6 is a planned metro line of the Bucharest Metro. The M6 Line will connect Bucharest North railway station (Gara de Nord) to Henri Coandă International Airport (Aeroport Otopeni). The line is expected to be completed by 2020-2021.

The construction of the new line is estimated to cost around 1.2 billion euros. The Japan Bank for International Cooperation is financing the project with 300 million euros.

Stations

M6 Line will have a total of 12 stations: 1 station shared with the existing M4 Line and 11 planned new stations: Pajura, Expoziţiei, Piaţa Montreal, Gara Băneasa, Aeroport Băneasa, Washington, Paris, Bruxelles, Otopeni, Ion I.C. Brătianu, and Aeroport Otopeni.

References

Bucharest Metro Line M6 Wikipedia


Similar Topics