Boston University Central (MBTA station)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Owned by
  
MBTA

Disabled access
  
Yes

Platforms in use
  
2

Connections
  
MBTA Bus, CT2

Line(s)
  
Green Line– "B" Branch

Opened
  
1894

Tracks
  
2

Boston University Central (MBTA station)

Location
  
Commonwealth Avenue at St. Marys Street Boston, Massachusetts

Rebuilt
  
March 18, 2002 - November 18, 2003

Passengers (2011)
  
2,194 (weekday average boardings)

Address
  
Boston, MA 02215, United States

Owner
  
Massachusetts Bay Transportation Authority

Similar
  
Boston University East, Boston University West, Blandford Street, Pleasant Street, John Harvard

Boston University Central is a surface-level light rail station on the MBTA Green Line "B" Branch, located the center median of Commonwealth Avenue west of St. Marys Street in Boston, Massachusetts, surrounded by the Boston University campus. It consists of two side platforms, which serve the "B" Branch's two tracks.

Contents

The station is fully handicapped-accessible, with raised platforms to allow level boarding onto low-floor trams and a high platform on the inbound side to serve high-floor trams. Boston University Central is one of only five surface stations on the "B" branch that is handicapped-accessible (the others are Boston University East, Harvard Avenue, Washington Street, and the branch's terminus at Boston College).

History

The station has the third-highest ridership on the "B" Branch (after only Harvard Avenue and Packards Corner). Because of their high ridership, Boston University East and Boston University Central were rebuilt with slightly raised platforms in 2002-03 to allow level boarding onto the new Type 8 trams. Service was provided to an interim station with temporary platforms between the two stops during construction. Construction began on March 18, 2002, a week behind schedule due to delays in finishing up similar work at Harvard Avenue and Washington Street. The project was then expected to be completed within six months.

However, poor weather and limited work periods (as most work could only be done during the four hours at night that no trains used the line) delayed the completion date first to December 2002, then March 2003. The contractor informed the MBTA in early 2003 that they would be unable to complete the work; a new contractor was chosen in mid-2003, but work did not resume until September. The stations were completed and reopened on November 18, 2003.

Bus connections

Four MBTA Bus routes have connections near the station:

  • CT2 Sullivan Station - Ruggles Station via Kendall/MIT
  • 47 Central Square, Cambridge - Broadway Station via B.U. Medical Center, Dudley Station & Longwood Medical Area
  • 57 Watertown Yard - Kenmore Station via Newton Corner & Brighton Center
  • 57A Oak Square - Kenmore Station via Commonwealth Avenue
  • The CT2 and 47 stop at Commonwealth Avenue at University Road (northbound) and Mountfort Street at Lenox Street (southbound) to the west of the station, and Park Drive at Beacon Street to the south. The 57 and 57A stop on Commonwealth Avenue at Saint Mary's Street directly across from the station.